Above you can see the waterproofing stuff (pink) over the polymer
barrier ( tar).
Backfilling Friday 11/6/09. Framers showed up first thing Monday.
THis was done by about 10am.. Next I set about marking all the
I-joists. There are 4700 feet of them, a total of 163 to be cut
into 216 different peices in the final tally. You can only buy
then in 2' increments so odd lengths are combined to minimize
waste. Each joist was lettered A though N
|
Combos |
|
|
Combos |
|
|
|
Combos Sorted |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Quan |
Length |
Feet |
A |
7 |
41 |
287 |
7 |
41 |
287 |
|
A |
7 |
7 |
41 |
287 |
|
7 |
41 |
287 |
B |
25 |
40 |
1000 |
25 |
40 |
1000 |
|
B |
25 |
25 |
40 |
1000 |
|
32 |
40 |
1280 |
C |
45 |
26 |
1170 |
45 |
26 |
1170 |
|
H |
14 |
7 |
40 |
280 |
|
12 |
36 |
432 |
D |
19 |
24 |
456 |
19 |
24 |
456 |
|
G |
22 |
11 |
36 |
396 |
|
1 |
34 |
34 |
E |
34 |
22 |
748 |
34 |
22 |
748 |
|
L |
7 |
1 |
36 |
36 |
|
1 |
30 |
30 |
F |
5 |
12 |
60 |
|
|
|
|
K |
10 |
1 |
34 |
34 |
|
51 |
26 |
1326 |
|
5 |
8 |
40 |
5 |
20 |
100 |
|
M |
5 |
1 |
30 |
30 |
|
20 |
24 |
480 |
G |
11 |
21 |
231 |
|
|
|
|
C |
45 |
45 |
26 |
1170 |
|
34 |
22 |
748 |
|
11 |
15 |
165 |
11 |
36 |
396 |
|
I |
10 |
5 |
26 |
130 |
|
5 |
20 |
100 |
H |
7 |
25 |
175 |
|
|
|
|
J |
4 |
1 |
26 |
26 |
|
|
|
|
|
7 |
15 |
105 |
7 |
40 |
280 |
|
D |
19 |
19 |
24 |
456 |
|
|
|
4717 |
I |
5 |
15 |
75 |
|
|
|
|
N |
4 |
1 |
24 |
24 |
|
|
|
|
|
5 |
11 |
55 |
5 |
26 |
130 |
|
E |
34 |
34 |
22 |
748 |
|
163 |
|
|
J |
4 |
6.5 |
26 |
1 |
26 |
26 |
|
F |
10 |
5 |
20 |
100 |
|
|
|
|
K |
9 |
3 |
27 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
6.5 |
6.5 |
1 |
34 |
34 |
|
|
216 |
|
|
4717 |
|
|
|
|
L |
2 |
8 |
16 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
4 |
20 |
1 |
36 |
36 |
|
|
|
|
|
|
|
|
|
|
M |
5 |
6 |
30 |
1 |
30 |
30 |
|
|
|
|
|
|
|
|
|
|
N |
4 |
6 |
24 |
1 |
24 |
24 |
|
|
|
|
|
|
|
|
|
|
|
216 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Noon Tuesday, 11/10/09
Dyno Shelf